by Watershed | Jul 29, 2014 | News/Blog
Saufley Field Landfill completes year by withstanding 22” rainfall event and winning SWANA Silver Award for Landfill Remediation by using ClosureTurf™ Alpharetta, GA (PRWEB) July 29, 2014 The Solid Waste Association of North America (SWANA) awarded...
by Watershed | Jul 18, 2014 | News/Blog
Watershed Geosynthetics provides Terminus Wake Park with HydroTurf® providing an aesthetically superior erosion control technology and minimum long term maintenance. Alpharetta, GA (PRWEB) July 16, 2014 Terminus, the first occupant of the massive LakePoint Sporting...
by Watershed | Jan 27, 2014 | News/Blog
Landfill Features All in One Final Landfill Cap and Gas Collection System January 13, 2014-Atlanta, GA— After combating nearly a decade of erosion issues, Tangipahoa Parish Waste Facility (TPWF) of Independence, LA finally found long awaited success in covering the...
by Watershed | Dec 9, 2013 | News/Blog
The main advantages of HydroTurf™ are that it looks and feels like natural turf with the strength and performance of a hard armor revetment. Recently, Nicklaus Design Group benefited from these advantages at the La Moraleja Country Club just outside of Madrid,...
by Watershed | Dec 9, 2013 | News/Blog
With the ClosureTurf™ System, landfill operators are containing a greater amount of emissions and odors while simultaneously slashing costs and producing a superior gas for energy projects. With the increased demand for better odor control as well as the need...
by Watershed | Oct 10, 2013 | News/Blog
On June 9, 2013 Saufley Field Road C&D Landfill experienced a rain event of an estimated 4.5 inches/hour for approximately one (1) hour. The facility experienced some minor rilling as shown in the first photograph to the right. The aforementioned rain event was...