LEWIS CREEK RESEVOIR
LOCATION
Willis, TX
Owner
Entergy
Engineer
Entergy
Contractor
Tetra Tech AEG
Size/Product
1,489,000 sq ft
HydroTurf® Z
Turf Type 1- 50%
Field/50% Jute
Date completed
February 2018
Project Highlights
- HydroTurf was chosen for this site due to its impermeability, aesthetic nature, speed of installation, and low maintenance post installation.
- HydroTurf provided necessary slope protection from erosion for this site, made even more significant by the millions of gallons of water just on the other side.