Lemons Sanitary Landfill
Lemons Sanitary Landfill is the first approved final closure in Missouri to use ClosureTurf®. The site struggled with availability and quality of soil to close with a traditional vegetative cap. Because ClosureTurf requires no soil to close, it reduced the number of truckloads required to bring in soil and reduced the over carbon footprint. It […]
Timber Ridge Landfill
In December 2010, Progressive Waste Solutions (formerly IESI-BFI Canada) installed ClosureTurf® on ten acres of its Timber Ridge Landfill in Richwoods, MO. The installation at Timber Ridge was the second of its kind. It resulted because of the positive experience IESI had with the very first installation of ClosureTurf at the La Salle Grant Landfill […]
Rush Island Energy Center Ash Pond Closure
Ameren Corporation, a Missouri and Illinois power company, chose to use ClosureTurf® for their 111-acre Rush Island Ash Pond Closure located in Festus, MO. Rush Island is the third-largest energy center operated by Ameren Missouri. ClosureTurf helped to eliminate many of the issues presented in a traditional landfill cover. Using ClosureTurf on this project eliminated […]
Asbury Power Plant
Asbury Power Plant chose ClosureTurf® as their final cover system to address and solve soil erosion, slope integrity, installation and maintenance cost control, EPA regulation compliance, and longevity and appearance of the final landfill cover. In 2022, Liberty closed approximately 107.5 acres of their CCR impoundment with ClosureTurf at the Asbury Power Plant in Jasper […]