Tri-City Landfill

The MSW landfill site in Petersburg, VA—known as the Tri-City Landfill—was closed in two phases using the ClosureTurf® system. Due to the site’s complex geometry, ClosureTurf was a viable solution capable of addressing challenges such as limited access and steep slopes.  Located in a densely commercial and urban area along the Appomattox River, the ClosureTurf […]

Louisa County Landfill

Faced with silty and highly erodible soils, Louisa County turned from traditional closure methods to an advanced engineered closure system that would be the first of its kind in the state. Traditional final cover systems approved by the Virginia Solid Waste Management Regulations include 18 inches of clay, a geosynthetic clay liner (GCL), or a […]

Pump Road Dam

The Pump Road Dam (also known as the Canterbury Lake Dam) was recently upgraded to meet current Dam Safety Regulations. Henrico County selected the HydroTurf® advanced revetment technology for overtopping protection to comply with these regulations. Cost savings, ease of installation, elimination of road and lane closures, and aesthetics all played a role in their […]

Accomack County Northern Landfill

Accomack County chose ClosureTurf® for its landfill closure of Cell 2 based on proven performance as well as environmental and cost benefits. The product solved the landfill’s sandy soil erosion issues, significantly reduced the short and long-term maintenance costs and minimized the carbon footprint of the landfill closure.