HWY 34 DEVELOPMENT POND

SLOPE PROTECTION

LOCATION

Johnstown, CO

Owner

Martin Marietta

Contractor

Frontier Environmental

Size/Product

14,300 sq ft
HydroTurf® Z
Turf Type 1 – 50% Field / 50% Jute

Date completed

2018

Project Highlights

  • The Project owner was experiencing erosion rills down the slope and issues with establishing vegetation. To mitigate this and meet their erosion control permit needs, they installed HydroTurf® which was able to handle the onsite runoff on the steep 2:1 slopes. HydroTurf was able to provide the necessary slope protection to keep the HWY 34 Development Pond in compliance.