Baldwin County Landfill

Milledgeville, GA

Project Type

Owner

Baldwin County

Contractor

Oasis Consulting Services

Engineer

Oasis Consulting Services

Size

19 Acres

Date Completed

2017

The Baldwin County Landfill marks a historical final closure as not only the first of its kind in the state of Georgia, but one of the first in the country to feature an entirely new landfill design process utilizing the ClosureTurf® system. Featuring an innovative benchless design, the system eliminated the need for diversion berms, benches and down chutes by completely changing the hydrology methods in the traditional design.

In 2016, Baldwin County Board of Commissioners sought a design-build option for the closure of the 21.5-acre, Phase 3 Union Hill Church Road landfill. Oasis Consulting Services, a metro-Atlanta based woman-owned engineering consulting firm, was awarded the contract and obtained the Georgia Environmental Protection Division (EPD) approval of ClosureTurf in lieu of a traditional vegetated cap.

With SPLOST funds stretched, the county was relieved that the design-build solution from Oasis came in $1.5 million under traditional procurement. The approved ClosureTurf® system attributed to much of the cost savings. It eliminated the standard USEPA costly, low-permeability clay liner, as well as vertical in-waste gas collection wells. But the real distinctive advantage was the use of a benchless design to enhance the hydraulic benefits of ClosureTurf. Even with slopes steeper than 3:1 in some locations, the benchless design allows the entire cap to sheet flow to the perimeter ditches, eliminating the need for diversion berms (used to combat drainage length) and downslope channels (energy dissipation). This cutting-edge design ultimately created a domino effect in cost savings and risk management for the county.

“We will probably make history. This is the first municipal solid waste landfill that has been closed in the state of Georgia with this process. We already have several individuals from several states that have come down and visited. It will be a showplace for the state of Georgia,” said Ralph McMullen, Baldwin County Manager.

Oasis was able to complete the installation in about half of the time required for prescriptive caps. In addition to design and construction savings, future maintenance will be drastically reduced during the long-term post closure care period. The surrounding environment will also benefit, especially water quality, as a result of two key factors: the avoidance of fertilizers that will not be necessary to grow and maintain grass; and the elimination of soil erosion and sediment-laden runoff from the cap.

As acknowledgement for their innovative approach, Baldwin County and Oasis Consulting Services was awarded the 2017 Georgia Chapter American Public Works Association engineering award for innovative, small/rural community projects.

Keep Exploring Projects

Nabors Landfill

Mountain Home, AR

Accomack County Northern Landfill

Accomack County, VA

Port Angeles Landfill

Port Angeles, WA

Covanta Energy

Carver, MA & Haverhill, MA

Louisa County Landfill

Mineral, VA

Harrietsfield Landfill

Nova Scotia, Canada

LEARN MORE ABOUT HOW WATERSHED GEO® PRODUCTS CAN HELP YOUR NEXT PROJECT.

Click below to reach one of our representatives for more information, request product samples, schedule a tour of one of our facilities and more.