Village Creek Water Reclamation Facility

Arlington, TX

Project Type

Product Type

HydroTurf® CS - 100% Green

Owner

City of Fort Worth

Contractor

McCarthy Builders

Engineer

CP&Y

Size

23,000 sf

Date Completed

2017

Recent upgrades to the award-winning Village Creek Water Reclamation Facility include using HydroTurf® for erosion protection in a large dam spillway.

Owned and operated by the City of Fort Worth, the Village Creek Water Reclamation Facility was built in 1958 and has been expanded over the last 60 years. Its original treatment capacity of 5 million gallons per day (mgd) has grown to over 110 mgd today. The facility now serves more than 880,000 people and numerous industries in 23 communities. The plant is capable of processing 166 million gallons of wastewater each day. In order to handle this large volume, excess wastewater must be stored in staging reservoirs until it can be treated and released. Watershed Geo’s HydroTurf is playing a key role in the latest improvement phase of this part of the facility.

Village Creek Water Reclamation Facility
As part of the post-construction sign-off, the contractor was required to perform a traffic loading test over HydroTurf®. A typical maintenance vehicle was driven across the HydroTurf twenty (20) times during dry and wet conditions. No damage to the system was noted due to the vehicle loading.

Because of its superior erosion protection, HydroTurf was selected over articulated concrete block as a hard armor revetment for the dam spillway located between the main reservoir and the secondary overflow. Typically, wastewater spills over as it reaches a max capacity. Because volumes can sometimes be reached quickly, the spillway was designed to handle a flow rate of 110 million gallons per day and a peak velocity of over 20 ft/sec. HydroTurf was also selected since it will stand up to vehicle and equipment traffic on an ongoing basis for the required monitoring and maintenance.

Aerial view of the upper and lower reservoirs.
HydroTurf® is an engineered revetment solution designed to provide armoring of hydraulic structures against high velocity and shear stress. It offers the aesthetics of vegetation combined with better performance than traditional hard armor.

Keep Exploring Projects

Avenida La Pata Gap Closure

San Juan Capistrano,

Crosley Lake Dam

North Vernon, IN

Purdue University Thomas Farms Landfill

West Lafayette, IN

Ford Street Canal

Ft. Myers, FL

Franklin Landfill Downchutes

Grove City, OH

Armstrong Lake Dam

Sudbury, Ontario

LEARN MORE ABOUT HOW WATERSHED GEO® PRODUCTS CAN HELP YOUR NEXT PROJECT.

Click below to reach one of our representatives for more information, request product samples, schedule a tour of one of our facilities and more.