The Project owner was experiencing erosion rills down the slope and issues with establishing vegetation. To mitigate this and meet their erosion control permit needs, they installed HydroTurf® which was able to handle the onsite runoff on the steep 2:1 slopes. HydroTurf was able to provide the necessary slope protection to keep the HWY 34 Development Pond in compliance.