Electric Company Pond Remediation  

Tampa, FL

Project Type

Engineer

Ferguson Waterworks

Installer

COMANCO Environmental Corporation

Size

30,000 SF (0.69 acres)

Date Completed

2025

Challenge

A southern utility company needed to rehabilitate a process water treatment pond that was experiencing erosion and deteriorating infrastructure. The remediation required stabilizing the pond’s slopes, improving drainage, and protecting water quality while providing a durable, long-term solution to minimize future maintenance.  

Solution

As part of the comprehensive pond remediation, COMANCO Environmental Corporation regraded the slopes, stabilized the pond foundation, and installed approximately 30,000 square feet of HydroTurf® CS to provide erosion protection. The system was selected to provide durable erosion protection and long-term slope stability while minimizing maintenance experienced with conventional vegetated erosion-control systems. HydroTurf CS supports improved water quality by minimizing potential soil loss and sediment migration associated with conventional erosion-control approaches. 

Result

Completed in 2025, the project restored the pond slopes with a durable erosion-protection solution designed for long-term performance. The completed system provides a low-maintenance, aesthetically compatible solution for long-term protection of the rehabilitated pond supporting water quality and reliable pond operations. 

Keep Exploring Projects

Indian Acres / Lake Pocahontas

Spotsylvania Courthouse, VA

Stewart Creek Shoreline Protection

The Colony, TX

Olympia Hills Drainage Channel

Selma, TX

Summerfield Pond

Hyattsville, MD

Haynesville Correctional Facility Repair

Haynesville, VA

Ox Mountain Downdrain

Half Moon Bay, CA

LEARN MORE ABOUT HOW WATERSHED GEO® PRODUCTS CAN HELP YOUR NEXT PROJECT.

Click below to reach one of our representatives for more information, request product samples, schedule a tour of one of our facilities and more.